| Area   | 
         Mainstem Trinity  | 
     
     
         | Topic | 
         Stream Channel: Cross-Section Sheridan Feather Edge | 
     
 
 
    | 
   Caption:  Trush and McBain measured cross sections at the Sheridan Feather Edge project site at river mile (RM) 81.1 on the Trinity River from 1995 to 1997.  Some scouring is occurring near the bank that was not treated during the feather edge construction but otherwise bed elevation seems to have remained stable after the 1997 storm.  This cross section number is 01+35 (USFWS XS 2) with data collected by Trush and McBain.  See Info Links for more information.
 | 
 
 
    | 
     | 
 
To learn more about this topic click 
Info Links .
To view additional information (data source, aquisition date etc.) about this page, click 
Metadata .
To view the table with the chart's data, click 
  
 Chart Table web page.
To download the table with the chart's data, click 
 81xs0135.dbf (size 22,680 bytes)  .